A replacement shower pan in an older apartment almost never fails because of the pan. It fails for one of three reasons: the drain is not where the old unit led you to expect, the subfloor is not level, or the new pan was damaged on the trip up the stairs. A one-piece moulded SMC pan is built around all three problems — its drain position is a published dimension you can check against the exposed pipe before you order, a 36 × 36 in pan weighs 13.6 kg (30 lb) so one installer can carry it, and the low-profile range stands just 26 mm high. In a retrofit, the real work is the survey and the measuring.
Why do old bathrooms rarely match the plan?
Because the plan, if it survives at all, describes the building as designed — not as renovated, repaired and re-plumbed over decades. Drawings for older blocks are often lost, and even when they exist, a previous refit may have moved the drain, boxed in a pipe run or raised the floor with extra board and tile. The unit you are removing hides the evidence: a tub or an old one-piece fiberglass shower unit covers the drain and the condition of the floor beneath it. Walls are frequently out of square, and the alcove width at floor level can differ from the width at shoulder height. Even units on the same stack line can differ — each has its own repair history. The rule for renovation contractors is simple: treat every unit as an individual survey — never order unit twelve’s pan from unit eleven’s measurements.
How do you measure a drain you cannot see yet?
You do not measure it until you can see it. That sequencing is what separates a smooth programme from a warehouse of wrong pans: demolish first, order second. Once the old unit is out and the waste pipe is exposed, measure the drain centre from two fixed references — the finished face of the back wall and the finished face of the side wall. Record both, and photograph the tape in place so the numbers can be checked against the pan drawing later. Then compare it with the manufacturer’s published drain dimension for the model you intend to use. On our Serie L model L-12080 — 1200 × 800 × 26 mm — the drain outlet centre sits 200 mm from the short edge, with a 90 mm outlet and a 126 mm square drain cover. That one number tells you before ordering whether the pan drops onto the existing pipe or the pipe has to move. Two cautions: the drawing is schematic, so confirm the current drawing with us before ordering against it; and if the measured position falls between models, moving a short section of pipe is usually cheaper than forcing a pan onto a drain it was not drawn for. The full measurement method, including checking from the stud before finishes go on, is in our drain position guide.
Run these five checks on every unit, in this order, before a single pan is ordered.
| Old-building problem | What to check | What the pan spec must give |
|---|---|---|
| Off-centre drain | The actual drain centre, measured from two finished walls after demolition — not the drawing | A published drain dimension you can match to the measurement, such as an outlet centre 200 mm from the short edge |
| Out-of-level floor | Straightedge and level across the alcove in both directions; check for bounce or rot in the subfloor | A rigid one-piece pan bedded on a full mortar bed that fills the low spots — support everywhere, never point shims |
| Cast-iron drain pipe | Pipe material and condition, and the height of the connection relative to the finished floor | A standard 90 mm outlet that connects to the existing waste without raising the pan |
| Walk-up access | Stair width, landing turns and door clearances along the whole route from street to bathroom | A pan one installer can carry — 13.6 kg (30 lb) at 36 × 36 in — in a size that makes the landing turn |
| Thin floor build-up | Total height available from subfloor to finished floor, and the threshold detail at the bathroom door | A 26 mm profile that keeps the finished floor close to the existing level and the step-over low |
What does a low 26 mm threshold buy you in a retrofit?
Every layer you add under a pan has to be paid for at the door threshold, at the junction with the existing floor finish, and in step-over height. The Serie L range — widths of 700, 800 and 900 mm and lengths from 800 to 1800 mm — is 26 mm high across the whole range, so the finished shower floor sits close to the level of the floor it replaces. That keeps the threshold detail simple, avoids a ramp or raised plinth, and makes the shower easier to step into for older tenants ageing in place. Where the project follows US imperial sizing, the Serie K range covers 36–60 in × 30–48 in at 4 in high. Check the threshold arithmetic for the range you choose before committing to it across a whole block.
Why does pan weight matter above the ground floor?
On a new-build site, pan weight is a footnote. In a walk-up renovation it is a logistics line item. There is no elevator, the staircase is narrow with tight landing turns, and the installer who carries the pan in also carries the old unit out. A 36 × 36 in SMC pan weighs 13.6 kg (30 lb) — a one-person carry, up the stairs, through the door and into the alcove, without a second pair of hands, and without the corner damage heavy pans pick up when dragged and rested on stair edges. Multiply that across dozens of units and the difference shows up in labour hours, breakages, and how many units a crew finishes in a day. A light pan on a mortar bed also spreads its load evenly over older joists instead of concentrating it. When comparing pan materials for a retrofit, weigh the largest size you plan to use, not the smallest, and walk the route it has to travel.
What support does an uneven subfloor need?
An SMC pan is mortar-bed installed, and the rule is absolute: full support across the whole underside, never shimmed on points. Point shims concentrate load, let the pan flex underfoot, and are where cracks and drain-seal failures begin. The mortar bed reconciles a rigid pan with an imperfect floor: it fills the low spots and supports the drain area and the standing surface alike. Two things the bed must not be asked to do: it is not a structural repair, so sagging joists, rot and deflection get fixed before the bed goes down; and it does not create the drainage slope. The slope is moulded into the pan at the standard 1/4 in per foot (2%), which is why the bed itself must be level — a tilted bed fights the moulded slope. Set the pan, check it does not rock or flex underfoot, and confirm the drain connection before the bed cures. The full bedding sequence is in our installation guide, and the slope test for the finished floor is covered in pooling and slope. Get the support right and an uneven old floor stops being a problem.
Frequently asked questions
Can I order the pans before demolition to keep the programme moving?
It is the most common scheduling mistake in apartment renovation. Until the old unit is out, the drain position and the floor condition are guesses, and a pan ordered against a guess that turns out wrong costs more time than the demolition you were trying to save. Demolish first, measure the exposed drain from two walls, then order against the published dimension.
Does an SMC pan connect to a cast-iron drain?
Yes, through a standard drain assembly: the Serie L outlet is 90 mm, and the connection is made at the waste pipe with the drain body specified for the model. What decides the job is the connection height: check the existing waste height against the finished floor during the survey, so the pan does not have to be raised to meet it.
What if the subfloor is badly out of level?
A mortar bed takes up the modest unevenness typical of older floors, because it is shaped to the floor and supports the whole underside. What a bed cannot fix is structure: sagging or bouncing joists, rot and large level differences across the alcove must be repaired or levelled first. The pan is never shimmed on points to make up the difference.
SMC Shower Engineering Team · Last updated: November 2026
Renovating a block of older units? Start with the measurement that decides whether a pan fits — our drain position guide walks through checking it from the stud, before anything is ordered.